A toothpaste factory had a problem: they sometimes shipped empty boxes, without the tube inside. This was due to the way the production line was set up, and people with experience in designing production lines will tell you how difficult it is to have everything happen with timings so precise that every single unit coming out of it is perfect 100% of the time. Small variations in the environment (which can’t be controlled in a cost-effective fashion) mean you must have quality assurance checks smartly distributed across the line so that customers all the way down the supermarket don’t get pissed off and buy someone else’s product instead.

Understanding how important that was, the CEO of the toothpaste factory got the top people in the company together and they decided to start a new project, in which they would hire an external engineering company to solve their empty boxes problem, as their engineering department was already too stretched to take on any extra effort.

The project followed the usual process: budget and project sponsor allocated, RFP, third-parties selected, and six months (and $8 million) later they had a fantastic solution — on time, on budget, high quality and everyone in the project had a great time. They solved the problem by using some high-tech precision scales that would sound a bell and flash lights whenever a toothpaste box weighing less than it should. The line would stop, and someone had to walk over and yank the defective box out of it, pressing another button when done.

A while later, the CEO decides to have a look at the ROI of the project: amazing results! No empty boxes ever shipped out of the factory after the scales were put in place. Very few customer complaints, and they were gaining market share. “That’s some money well spent!” – he says, before looking closely at the other statistics in the report.

 It turns out, the number of defects picked up by the scales was 0 after three weeks of production use. It should’ve been picking up at least a dozen a day, so maybe there was something wrong with the report. He filed a bug against it, and after some investigation, the engineers come back saying the report was actually correct. The scales really weren'’t picking up any defects, because all boxes that got to that point in the conveyor belt were good.

Puzzled, the CEO travels down to the factory, and walks up to the part of the line where the precision scales were installed. A few feet before it, there was a $20 desk fan, blowing the empty boxes out of the belt and into a bin. “Oh, that — one of the guys put it there ’cause he was tired of walking over every time the bell rang”, says one of the workers.

Popular posts from this blog

Installation of Diesel Fuel Tanks for Fire Pumps (OLD)

This article is based upon 2009 IFC codes and is obsolete. See newer version here:  https://blog.anvil-fire.com/2024/03/installation-of-diesel-fuel-tanks-for.html After you have determined the size of fuel tank you need for a diesel fire pump, what are the general requirements for installation?  Assuming that you are under under the International Building/Fire Codes, you would go through the following chain of code references: IFC (2009 edition) 3401.2 Nonapplicability. This chapter shall not apply to liquids as otherwise provided in other laws or regulations or chapters of this code, including: ... (3) Storage and use of fuel oil in tanks and containers connected to oil-burning equipment. Such storage and use shall be in accordance with Section 603 . For abandonment of fuel oil tanks, this chapter applies. IFC (2009 edition) 603.1 Installation. The installation of nonportable fuel gas appliances and systems shall comply the International Fuel Gas Code. The installation of all oth

Diesel Exhaust Requirements

The exhaust from a diesel engine driving a fire pump is an often-overlooked item.  The high heat put out by the exhaust is a hazard to occupants and can greatly contribute to overheating the room itself. NFPA 20 (2013 edition), section 11.5 covers "Engine Exhaust" and should be carefully reviewed. However as a starting point, the following items should be considered. Exhaust Discharge Location The first step is to determine where you are going to discharge the exhaust gases. NFPA 20 section 11.5.3 for "exhaust discharge location" has the generic common-sense requirements of do not discharge where you might hurt people, damage the building, or directed on combustible materials. But very little specific requirements are provided. There is a loose reference in NFPA 20 back to NFPA 37 ( Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines ). In addition, the International Mechanical Code (IMC) section 915.1 directs us back to NFPA 3

Fire Pump Rating (Size) Selection

Fire pump sizing is not like commercial pump sizing. We don't care about efficiency, and you order pumps in only specific sizes. This article touches upon some items to consider when picking a fire pump. In general, the first step is determining your system demand point. Discussion of how exactly you determine this is beyond the scope of this article and has a lot of nuance depending upon your site-specific needs. However, for simplicity let's assume that you have a dry-system in an attic with a demand point of 305 gpm (2535 sq ft x 0.10 gpm/sq ft x 1.20 overflow/imbalance factor). Rated Flow (gpm) Sizing The first item you must specify is the pump flow rate. Per NFPA 20 (2013 edition) table 4.8.2 pumps are only allowed to be listed with the following flow rates in gpm: 25, 50, 100, 150, 200, 250, 300, 400, 450, 500, 750, 1000, 1250, 1500, 2000, 2500, 3000, 3500, 4000, 4500, 5000 So with our example demand of 305 gpm, would you go with a 300 or 400 gpm rated fire pump?